Promotional Decorative Jacquard Beach Towel
- OEM
- China
- 30 days
- 10 Million pcs/ Year
1. Promotional beach towels for : Abbott/ AVON/ SHESEIDO/UNILEVER etc
2. Size: 70*130cm, 70*140cm, 27*54" 75*150cm or bigger size
3. Style: OEM
4. Color aberration: over 4 grade for grey card
5. Weight difference: ±2.5
Water absorbency: < 5 seconds
Cotton: 100%
Lint rate: < 4%
Color fastness: 4-5 grade3. Shipping policy:
Ship by sea with FOB/CIF/C&F ect term. Or Ship by air with small quantity or rush order.
4. How long it takes for you to receive the towels?
From China
To Aisa
To Middle east
To Europe
To North America
To South America/Australia
Time
3-14days
20-30days
25-35days
25-35days
30-45days
Promotional Decorative Jacquard Beach Towel:
Weight difference: ±2.5
Water absorbency: < 5 seconds
Cotton: 100%
Lint rate: < 4%
Test QC: AQL 1.5
Promotional Decorative Jacquard Beach Towel:
1. Materials: We have different cotton yarns from 10s to 32s. The number is bigger, the yarn is thinner and better. We can choose the yarn based on your budget for this custom beach towels project
2. Production capability: We'll control our delivery time for the logo beach towels from 45-75 days based on the order of quantity. We have 4,000 towel producing factories here in our town which is the towel production base of China
3. These cheap beach towels totally AZO free and EU REACH standard with fiber reactive dyes, with colorfastness 4-5 grade.
4. Packing: we offer OEM packing based on your requirements for this promotional project.
4. Shipping policy:
Ship by sea with FOB/CIF/C&F ect term. Or Ship by air with small quantity or rush order.
5. How long it takes for you to receive the promo beach towels?
From China | To Aisa | To Middle east | To Europe | To North America | To South America/Australia |
Time | 3-14days | 20-30days | 25-35days | 25-35days | 30-45days |
6. You may like our similar Decorative Dobby Border Hand Towels
Yes,we accept OEM production. Please refer to below processes for the towel OEM. Design confirmation-------Mock up samples(7-14 days)------------Sample confirmation--------PO confirmed-----------Down payment done------------Mass production started-----------MP sample confirmed------QC------shippment...more